|
|
|
8.DURABILITY 耐久性
|
8.1
|
SLLDERING
TEST
可焊性试验
|
The tip of the terminals shall be
dipped 2mm in the solder bath at a
Temperature of 230±5℃ for 3±0.5sec.
端子顶部被浸入焊锡池2mm深,温度230±5℃
时间3±0.5秒.
|
A new uniform coating of solder Shall cover a minimum of 75% of the surface being immersed.
浸入的部分75%以上表面将被锡覆盖。
|
8.2
|
RESISTANCE
TO
SOLDERING
HEAT TEST
耐焊性试验
|
Solder bath method
Solder temperature 230±5℃
Immersion time 3±0.5scc
Immersion depth up to the surface of
the board
Thickness of PCB 1.6 mm.
焊炉焊的温度控制在230±5℃,过炉焊接的时间3±0.5秒,于(蒸板)厚度为1.6 mm.
Solder bath method
Bit temperature 300±10℃
application time 3±0.5scc
however excessive pressure shall not be applied to the terminal.
手焊接的时候温度需控制在300±10℃,时间为
3±0.5秒,但不能在排脚上施加异常压力。
|
Without deformation of case
Or excessive looseness of
mechanically electrical characteristics
Shall be satisfied.
本体无变形,能满足于机械、电器性能。
|
8.3
|
LIFI TEST
寿命试验
|
10000cycles of operation at a rate
of 15-18 cycles per minute with unloading.
无负载条件下,每分钟15-18次的速度操作10000次.
|
(1)Contact resistance接触阻抗.
100mΩ max.100毫欧以下.
(2)Operating force动作力. ±30%Inltial value.
变化范围初始值±30%.
(3)ITEN 项目—6.2
(4)ITEN 项目—6.3
(5)ITEN 项目—7.2
(6)ITEN 项目—7.3
|
8.4
|
HEAT TEST
耐热试验
|
80±2℃ for 96 hours , caner test keep
in normal condition for 30minutes.
在80±2℃环境中放96小时,再放在正常环境中
30分钟后进行测试.
|
(1)Contact resistance 150mΩ max.
接触电阻150毫欧以下.
(2)Insulation resistance
绝缘电阻.
50MΩmin 50兆欧以上.
(3)There shall be no sign of damage mechanically and electrically.
无任何迹象显示机械及电器性能之损坏.
|
8.5
|
HUMIDITY TEST
耐湿试验
|
40±2℃ 90-95%RH for 96firs after test
keep in mortal condition for 30 min.
在40±2℃ 90-95%RH环境中放96小时,再放在正常环境中,30分钟后进行测试.
|
8.6
|
COLD TEST
耐冷试验
|
At -20±3℃ for 96hours,after test
kept in normal condition for 30 min.
在-20±3℃ 环境中放96小时,再置于正常环境中,30分钟后进行测试.
|